CS4500 Weekly Management Report
4/6/2009
Project Status
Updated Release posted to team website. This includes all must have features and a
couple
of nice to haves.
We continue to investigate options for optimizing the drawing. There are
also some features we’ve discovered in other GDS
Viewing apps that we are working on.
Accomplishments
Team – Finished Fourth sprint
-Second release released
Tim – Corrected bounding box code for AREF/SREF
nodes.
Implemetation of texture-based
rendering (beta) complete.
Adam
– Implemented Tooltips on UI Elements
Fixed bug related to Null
preferences loading
Curtis
- Worked on UI changes based on other
GDS Viewer app
-View
by structure
-Zoom to
structure
Josh – Generated
VVR2 document
Updated feature requirements for new UI elements
Scott
– Reviewed Draw manager code and provided suggestions for improvement
Goals & Priorities
● Short
○
Present Release build 2 during meeting with Prof. Brunvand 4/7 [Tim, Adam]
-Deliverable: Successful review
with all features and nice to haves
○
Review POC for 4/7 [Josh, Adam, Tim]
-Deliverable: Optimized drawing model
that allows for loading large files.
○
Continue QA process for application 4/7 [Adam, Curtis, Josh]
-Deliverable: Complete runs of
all test plans, log bugs in Bugzilla
○
Implement additional User Interface features as specified by Customer and Team
4/12 [Curtis]
-Deliverable: Additional UI
filtering options for GDS objects
● Long
○ Print test file on Epson plotter 4/5(delayed) [Scott, Curtis]
○ QA testing and verification for release 2
Complete 4/7. [Adam, Curtis, Josh]
Needs
None currently