CS4500 Weekly Management Report

3/23/2009

 

Project Status

            First Release posted to team website.  This includes all must have features and a couple

                of nice to haves.   We are working on optimization of the drawing system for our second

                release. There are some opportunities to flatten out the data model to speed drawing, since

                we are building a viewer and not an editor.

 

Accomplishments

                Team – Completed Third sprint

                                -First release posted to team site

                Tim – Continued optimization of drawing manager. 

                            Added hierarchy drawing depth for GDS

Adam – Enabled Drag Drop for layer ordering

                Worked on Bugs related to Preferences screen                            

Curtis -  Worked on UI changes as requested by sponsor

                Completed VVR 1 document

                Josh  Updated VVR document

                             Tested code for drawing Text/Fonts in OpenGL

                             Reviewed Drawing Manager for optimization opportunities

Scott – Developed print preview dialog

             Worked on scaling image from OpenGL to print dimensions       

 

Goals & Priorities

● Short

○ Complete work on VVR 2 document due 4/3 [Curtis, Adam]

                -Deliverable: Rough draft due 3/31

○ Present Release build during meeting with Prof. Brunvand 3/24 [Tim, Adam]

                -Deliverable: Successful review with all features and nice to haves

○ Review POC for  3/24 [Josh, Adam, Tim]

                -Deliverable: Merged C# solution that contains work from both teams.

○ Continue QA process for application 3/24 [Adam, Curtis, Josh]

                -Deliverable: Additional test plans for new features

○ Print preview and print scaling 4/1 [Scott, Josh]

○ Implement additional User Interface features as specified by Customer 3/24 [Curtis]

 

● Long

            ○ Print test file on Epson plotter 3/24(delayed) [Scott, Curtis]

            ○ QA testing and verification Complete 3/31. [Adam, Curtis, Josh]

 

Needs

None currently