CS4500 Weekly Management Report
3/23/2009
Project Status
First Release posted to team website. This includes all must have features and a
couple
of nice to haves. We are working on optimization of the
drawing system for our second
release. There are some
opportunities to flatten out the data model to speed drawing, since
we are building a viewer and
not an editor.
Accomplishments
Team – Completed Third sprint
-First release posted to team site
Tim – Continued optimization of drawing manager.
Added
hierarchy drawing depth for GDS
Adam
– Enabled Drag Drop for layer ordering
Worked on Bugs related to
Preferences screen
Curtis
- Worked on UI
changes as requested by sponsor
Completed VVR 1 document
Josh – Updated VVR document
Tested code for drawing Text/Fonts in OpenGL
Reviewed Drawing Manager for optimization opportunities
Scott
– Developed print preview dialog
Worked on scaling image from
OpenGL to print dimensions
Goals & Priorities
● Short
○
Complete work on VVR 2 document due 4/3 [Curtis, Adam]
-Deliverable: Rough draft due
3/31
○
Present Release build during meeting with Prof. Brunvand
3/24 [Tim, Adam]
-Deliverable: Successful review
with all features and nice to haves
○
Review POC for 3/24
[Josh, Adam, Tim]
-Deliverable: Merged C# solution
that contains work from both teams.
○
Continue QA process for application 3/24 [Adam, Curtis, Josh]
-Deliverable: Additional test
plans for new features
○
Print preview and print scaling 4/1 [Scott, Josh]
○
Implement additional User Interface features as specified by Customer 3/24
[Curtis]
● Long
○ Print test file on Epson plotter 3/24(delayed) [Scott, Curtis]
○ QA testing and verification
Complete 3/31. [Adam, Curtis,
Josh]
Needs
None currently